Tile, Plumbing and Glass Pros for Mercer Island Shower Replacement
Rather than one mixed list, this page splits Mercer Island's shower replacement pros by what they're licensed to do. 3 listings in all for Mercer Island: tile, plumbing and glass.
Licenses checked · Washington State Department of Labor & Industries
61%of homes built before 1980
What Mercer Island's housing stock means for shower replacement
The typical home in Mercer Island was built around 1973.
About 61% of Mercer Island's housing units were built before 1980, old enough that an original shower has very likely been replaced at least once already.
So a Mercer Island shower replacement often means removing a prior replacement, not the home's original fixtures.
Mercer Island's shower replacement pros, by trade
Grouped by trade, tile, plumbing and glass, then A to Z by business name within each.
Plumbing contractor (3)
Eco Electric Plmbng HTNG & Air
Plumbing contractor
- License
- Residential · ECOELEP746BT
- Since
- 2026
- Expires
- Feb 25, 2028
- ZIP
- 98040
Eco Electric Plmbng HTNG & Air
Plumbing contractor
- License
- Journey Level · ECOELEPA6175
- Since
- 2024
- Expires
- Oct 25, 2028
- ZIP
- 98040
MJTK Backflow
Plumbing contractor
- License
- Backflow Specialty · MJTKBB*763JA
- Since
- 2024
- Expires
- Apr 1, 2028
- ZIP
- 98040
Questions for each trade
- Tile: who waterproofs the wall before new tile goes up, and what product do they use?
- Tile: does the quote include removing the old surround, or does that happen separately?
- Plumbing: is the new valve pressure-balance or thermostatic, and what brand and model?
- Plumbing: does the drain stay in its current spot, or is it moving?
- Glass: framed or frameless, and is the glass tempered to meet the safety-glazing rule for wet locations?
- Glass: what's the lead time on ordering, since custom glass is often the longest-lead item on the job?
- All trades: who is the single point of contact if something needs to be redone?