4 Shower Replacement Pros Based in Madison Heights
Madison Heights homeowners replacing a shower can check pros in each relevant trade here first. 4 listings currently show up for Madison Heights, Virginia, across the three trades a replacement can involve.
Licenses checked · Virginia Department of Professional and Occupational Regulation, Board for Contractors
66%of homes built before 1980
What Madison Heights's housing stock means for shower replacement
Homes in Madison Heights were built in 1972, on the median.
66% of Madison Heights homes went up before 1980, before several of today's plumbing and glazing codes existed.
A shower replacement in one of Madison Heights's older homes is a reasonable time to bring the valve and glass up to current code, even if only the surround looked like it needed work.
Shower, tile, plumbing and glass pros based in Madison Heights, grouped by trade
Grouped by trade, tile, plumbing and glass, then A to Z by business name within each.
Plumbing contractor (4)
Goin Heating & Air Conditioning INC
Plumbing contractor
- License
- Class B – Plumbing Contracting (PLB) · 106826
- Since
- 2006
- Expires
- May 31, 2028
- ZIP
- 24572
Grassfield Plumbing INC
Plumbing contractor
- License
- Class A – Plumbing Contracting (PLB) · 031417
- Since
- 1995
- Expires
- Dec 31, 2027
- ZIP
- 24572
Phillip L Ware
Plumbing contractor
- License
- Class B – Plumbing Contracting (PLB) · 022007
- Since
- 1993
- Expires
- Sep 30, 2027
- ZIP
- 24572
Virginia Plumbing Solutions LLC
Plumbing contractor
- License
- Class A – Plumbing Contracting (PLB) · 201179
- Since
- 2026
- Expires
- Sep 30, 2028
- ZIP
- 24572
Questions for each trade
- Tile: who waterproofs the wall before new tile goes up, and what product do they use?
- Tile: does the quote include removing the old surround, or does that happen separately?
- Plumbing: is the new valve pressure-balance or thermostatic, and what brand and model?
- Plumbing: does the drain stay in its current spot, or is it moving?
- Glass: framed or frameless, and is the glass tempered to meet the safety-glazing rule for wet locations?
- Glass: what's the lead time on ordering, since custom glass is often the longest-lead item on the job?
- All trades: who is the single point of contact if something needs to be redone?