Shower Replacement Pros in Colonial Beach, VA
Colonial Beach homeowners replacing a shower can check pros in each relevant trade here first. 4 listings currently show up for Colonial Beach, Virginia, across the three trades a replacement can involve.
Licenses checked · Virginia Department of Professional and Occupational Regulation, Board for Contractors
50%of homes built before 1980
What Colonial Beach's housing stock means for shower replacement
The typical home in Colonial Beach was built around 1979.
About 50% of Colonial Beach's housing units were built before 1980, old enough that an original shower has very likely been replaced at least once already.
So a Colonial Beach shower replacement often means removing a prior replacement, not the home's original fixtures.
Colonial Beach's shower replacement pros, by trade
Grouped by trade, tile, plumbing and glass, then A to Z by business name within each.
Plumbing contractor (4)
Carroll V Shreve & Sons INC
Plumbing contractor
- License
- Class A – Plumbing Contracting (PLB) · 011246
- Since
- 1971
- Expires
- Feb 29, 2028
- ZIP
- 22443
Cusick S Plumbing LLC
Plumbing contractor
- License
- Class A – Plumbing Contracting (PLB) · 175549
- Since
- 2020
- Expires
- Jan 31, 2028
- ZIP
- 22443
Journeyman Construction INC
Plumbing contractor
- License
- Class A – Plumbing Contracting (PLB) · 043042
- Since
- 1998
- Expires
- Jan 31, 2028
- ZIP
- 22443
Thompson & Sons Plumbing LLC
Plumbing contractor
- License
- Class A – Plumbing Contracting (PLB) · 122725
- Since
- 2008
- Expires
- Jun 30, 2028
- ZIP
- 22443
Questions for each trade
- Tile: who waterproofs the wall before new tile goes up, and what product do they use?
- Tile: does the quote include removing the old surround, or does that happen separately?
- Plumbing: is the new valve pressure-balance or thermostatic, and what brand and model?
- Plumbing: does the drain stay in its current spot, or is it moving?
- Glass: framed or frameless, and is the glass tempered to meet the safety-glazing rule for wet locations?
- Glass: what's the lead time on ordering, since custom glass is often the longest-lead item on the job?
- All trades: who is the single point of contact if something needs to be redone?