6 Shower Replacement Pros Based in Vergas
Rather than one mixed list, this page splits Vergas's shower replacement pros by what they're licensed to do. 6 listings in all for Vergas: tile, plumbing and glass.
Licenses checked · Minnesota Department of Labor and Industry
55%of homes built before 1980
What Vergas's housing stock means for shower replacement
The typical home in Vergas was built around 1974.
About 55% of Vergas's housing units were built before 1980, old enough that an original shower has very likely been replaced at least once already.
So a Vergas shower replacement often means removing a prior replacement, not the home's original fixtures.
Shower, tile, plumbing and glass pros based in Vergas, grouped by trade
Grouped by trade, tile, plumbing and glass, then A to Z by business name within each.
Plumbing contractor (6)
Complete Plumbing Services INC
Plumbing contractor
- License
- Plumbing Contractor · PC704157
- Since
- 2016
- Expires
- Dec 31, 2027
- ZIP
- 56587
Hansons Plumbing & Heating
Plumbing contractor
- License
- Plumbing Contractor · PC644766
- Since
- 2012
- Expires
- Dec 31, 2027
- ZIP
- 56587
J M Bruhn Plumbing CO LLC
Plumbing contractor
- License
- Plumbing Contractor · PC643405
- Since
- 2012
- Expires
- Dec 31, 2027
- ZIP
- 56587
Legacy Plumbing LLC
Plumbing contractor
- License
- Plumbing Contractor · PC695801
- Since
- 2015
- Expires
- Dec 31, 2027
- ZIP
- 56587
Sonnenberg Excavating LLC
Plumbing contractor
- License
- Plumbing Contractor · PC643811
- Since
- 2012
- Expires
- Dec 31, 2027
- ZIP
- 56587
Sonnenberg Plumbing & Heating
Plumbing contractor
- License
- Plumbing Contractor · PC644231
- Since
- 2012
- Expires
- Dec 31, 2027
- ZIP
- 56587
Questions for each trade
- Tile: who waterproofs the wall before new tile goes up, and what product do they use?
- Tile: does the quote include removing the old surround, or does that happen separately?
- Plumbing: is the new valve pressure-balance or thermostatic, and what brand and model?
- Plumbing: does the drain stay in its current spot, or is it moving?
- Glass: framed or frameless, and is the glass tempered to meet the safety-glazing rule for wet locations?
- Glass: what's the lead time on ordering, since custom glass is often the longest-lead item on the job?
- All trades: who is the single point of contact if something needs to be redone?