Tile, Plumbing and Glass Pros for Woodbury Shower Replacement
Rather than one mixed list, this page splits Woodbury's shower replacement pros by what they're licensed to do. 5 listings in all for Woodbury: tile, plumbing and glass.
Licenses checked · Connecticut Department of Consumer Protection
52%of homes built before 1980
What Woodbury's housing stock means for shower replacement
Homes in Woodbury were built in 1979, on the median.
52% of Woodbury homes went up before 1980, before several of today's plumbing and glazing codes existed.
A shower replacement in one of Woodbury's older homes is a reasonable time to bring the valve and glass up to current code, even if only the surround looked like it needed work.
Woodbury's shower replacement pros, by trade
Grouped by trade, tile, plumbing and glass, then A to Z by business name within each.
Plumbing contractor (5)
Adolf Krueger CO INC
Plumbing contractor
- License
- Plumbing & Piping Unlimited Contractor · 291160
- Since
- 2024
- Expires
- Oct 31, 2027
- ZIP
- 06798
Dayton Construction Company INC
Plumbing contractor
- License
- Plumbing & Piping Limited Contractor · 289444
- Since
- 2019
- Expires
- Oct 31, 2027
- ZIP
- 06798
Jeff Gmuer Plumbing LLC
Plumbing contractor
- License
- Plumbing & Piping Unlimited Contractor · 289153
- Since
- 2019
- Expires
- Oct 31, 2027
- ZIP
- 06798
M J Fahy & Sons INC
Plumbing contractor
- License
- Plumbing & Piping Unlimited Contractor · 204042
- Since
- 1988
- Expires
- Oct 31, 2027
- ZIP
- 06798
William T Drakeley Swimming Pools
Plumbing contractor
- License
- Plumbing & Piping Limited Contractor · 280149
- Since
- 2000
- Expires
- Oct 31, 2027
- ZIP
- 06798
Questions for each trade
- Tile: who waterproofs the wall before new tile goes up, and what product do they use?
- Tile: does the quote include removing the old surround, or does that happen separately?
- Plumbing: is the new valve pressure-balance or thermostatic, and what brand and model?
- Plumbing: does the drain stay in its current spot, or is it moving?
- Glass: framed or frameless, and is the glass tempered to meet the safety-glazing rule for wet locations?
- Glass: what's the lead time on ordering, since custom glass is often the longest-lead item on the job?
- All trades: who is the single point of contact if something needs to be redone?