Tile, Plumbing and Glass Pros for Edwards Shower Replacement
Rather than one mixed list, this page splits Edwards's shower replacement pros by what they're licensed to do. 5 listings in all for Edwards: tile, plumbing and glass.
Licenses checked · Colorado Department of Regulatory Agencies (DORA)
7%of homes built before 1980
What Edwards's housing stock means for shower replacement
Homes in Edwards were built in 1996, on the median.
7% of Edwards homes went up before 1980, before several of today's plumbing and glazing codes existed.
A shower replacement in one of Edwards's older homes is a reasonable time to bring the valve and glass up to current code, even if only the surround looked like it needed work.
Edwards's shower replacement pros, by trade
Grouped by trade, tile, plumbing and glass, then A to Z by business name within each.
Plumbing contractor (5)
Adm LLC
Plumbing contractor
- License
- Plumbing Contractor (PC) · 2083
- Since
- 2008
- Expires
- Feb 28, 2027
- ZIP
- 81632
Ast & McFerrin Plumbing & Heating INC
Plumbing contractor
- License
- Plumbing Contractor (PC) · 1658
- Since
- 2008
- Expires
- Feb 28, 2027
- ZIP
- 81632
Avon Plumbing & Heating
Plumbing contractor
- License
- Plumbing Contractor (PC) · 1616
- Since
- 2008
- Expires
- Feb 28, 2027
- ZIP
- 81632
Snow Country Services INC
Plumbing contractor
- License
- Plumbing Contractor (PC) · 2660
- Since
- 2010
- Expires
- Feb 28, 2027
- ZIP
- 81632
Tropical Heat LLC
Plumbing contractor
- License
- Plumbing Contractor (PC) · 1338
- Since
- 2008
- Expires
- Feb 28, 2027
- ZIP
- 81632
Questions for each trade
- Tile: who waterproofs the wall before new tile goes up, and what product do they use?
- Tile: does the quote include removing the old surround, or does that happen separately?
- Plumbing: is the new valve pressure-balance or thermostatic, and what brand and model?
- Plumbing: does the drain stay in its current spot, or is it moving?
- Glass: framed or frameless, and is the glass tempered to meet the safety-glazing rule for wet locations?
- Glass: what's the lead time on ordering, since custom glass is often the longest-lead item on the job?
- All trades: who is the single point of contact if something needs to be redone?