Shower Replacement Pros in Santa Ynez, CA
Shower replacement in Santa Ynez, CA usually touches up to three trades. This page lists 9 pros based in Santa Ynez, split into tile, plumbing and glass.
Licenses checked · California Contractors State License Board
55%of homes built before 1980
What Santa Ynez's housing stock means for shower replacement
The typical home in Santa Ynez was built around 1978.
About 55% of Santa Ynez's housing units were built before 1980, old enough that an original shower has very likely been replaced at least once already.
So a Santa Ynez shower replacement often means removing a prior replacement, not the home's original fixtures.
Santa Ynez's shower replacement pros, by trade
Grouped by trade, tile, plumbing and glass, then A to Z by business name within each.
Plumbing contractor (9)
A S A P Plumbing & Drains
Plumbing contractor
- License
- C-36 Plumbing · 744776
- Since
- 1998
- Expires
- Jan 31, 2028
- ZIP
- 93460
Apex Plumbing Service
Plumbing contractor
- License
- C-36 Plumbing · 915928
- Since
- 2008
- Expires
- May 31, 2028
- ZIP
- 93460
D P M Plumbing CO
Plumbing contractor
- License
- C-36 Plumbing · 776149
- Since
- 2000
- Expires
- Mar 31, 2028
- ZIP
- 93460
Don E Kadlec HVAC
Plumbing contractor
- License
- C-36 Plumbing · 809445
- Since
- 2002
- Expires
- Jun 30, 2028
- ZIP
- 93460
Josh Stevens Plumbing
Plumbing contractor
- License
- C-36 Plumbing · 1076118
- Since
- 2021
- Expires
- May 31, 2027
- ZIP
- 93460
Laughlin Audio Video Electric INC
Plumbing contractor
- License
- C-36 Plumbing · 651365
- Since
- 1992
- Expires
- Feb 29, 2028
- ZIP
- 93460
Moe's Plumbing
Plumbing contractor
- License
- C-36 Plumbing · 748594
- Since
- 1998
- Expires
- Apr 30, 2027
- ZIP
- 93460
Precision Plumbing INC
Plumbing contractor
- License
- C-36 Plumbing · 529696
- Since
- 1988
- Expires
- Jan 31, 2028
- ZIP
- 93460
Ridgeline Plumbing INC
Plumbing contractor
- License
- C-36 Plumbing · 518395
- Since
- 1987
- Expires
- Aug 31, 2027
- ZIP
- 93460
Questions for each trade
- Tile: who waterproofs the wall before new tile goes up, and what product do they use?
- Tile: does the quote include removing the old surround, or does that happen separately?
- Plumbing: is the new valve pressure-balance or thermostatic, and what brand and model?
- Plumbing: does the drain stay in its current spot, or is it moving?
- Glass: framed or frameless, and is the glass tempered to meet the safety-glazing rule for wet locations?
- Glass: what's the lead time on ordering, since custom glass is often the longest-lead item on the job?
- All trades: who is the single point of contact if something needs to be redone?