Tile, Plumbing and Glass Pros for Rodeo Shower Replacement
Shower replacement in Rodeo, CA usually touches up to three trades. This page lists 6 pros based in Rodeo, split into tile, plumbing and glass.
Licenses checked · California Contractors State License Board
78%of homes built before 1980
What Rodeo's housing stock means for shower replacement
Homes in Rodeo were built in 1972, on the median.
78% of Rodeo homes went up before 1980, before several of today's plumbing and glazing codes existed.
A shower replacement in one of Rodeo's older homes is a reasonable time to bring the valve and glass up to current code, even if only the surround looked like it needed work.
Shower, tile, plumbing and glass pros based in Rodeo, grouped by trade
Grouped by trade, tile, plumbing and glass, then A to Z by business name within each.
Plumbing contractor (6)
Bay Plumbing & Rooter LLC
Plumbing contractor
- License
- C-36 Plumbing · 929458
- Since
- 2009
- Expires
- Dec 31, 2027
- ZIP
- 94572
Carrera Vallin Plumbing INC
Plumbing contractor
- License
- C-36 Plumbing · 1154561
- Since
- 2026
- Expires
- May 31, 2028
- ZIP
- 94572
El Maestro Plumber INC
Plumbing contractor
- License
- C-36 Plumbing · 975075
- Since
- 2012
- Expires
- Jul 31, 2028
- ZIP
- 94572
Papa's Plumbing
Plumbing contractor
- License
- C-36 Plumbing · 1051078
- Since
- 2019
- Expires
- Mar 31, 2027
- ZIP
- 94572
Solomon's Plumbing
Plumbing contractor
- License
- C-36 Plumbing · 1142930
- Since
- 2025
- Expires
- Sep 30, 2027
- ZIP
- 94572
V L Plumbing
Plumbing contractor
- License
- C-36 Plumbing · 936132
- Since
- 2009
- Expires
- Jun 30, 2028
- ZIP
- 94572
Questions for each trade
- Tile: who waterproofs the wall before new tile goes up, and what product do they use?
- Tile: does the quote include removing the old surround, or does that happen separately?
- Plumbing: is the new valve pressure-balance or thermostatic, and what brand and model?
- Plumbing: does the drain stay in its current spot, or is it moving?
- Glass: framed or frameless, and is the glass tempered to meet the safety-glazing rule for wet locations?
- Glass: what's the lead time on ordering, since custom glass is often the longest-lead item on the job?
- All trades: who is the single point of contact if something needs to be redone?