Tile, Plumbing and Glass Pros for Escalon Shower Replacement
Escalon homeowners replacing a shower can check pros in each relevant trade here first. 8 listings currently show up for Escalon, California, across the three trades a replacement can involve.
Licenses checked · California Contractors State License Board
33%of homes built before 1980
What Escalon's housing stock means for shower replacement
Homes in Escalon were built in 1986, on the median.
33% of Escalon homes went up before 1980, before several of today's plumbing and glazing codes existed.
A shower replacement in one of Escalon's older homes is a reasonable time to bring the valve and glass up to current code, even if only the surround looked like it needed work.
Shower, tile, plumbing and glass pros based in Escalon, grouped by trade
Grouped by trade, tile, plumbing and glass, then A to Z by business name within each.
Plumbing contractor (8)
Avery Plumbing
Plumbing contractor
- License
- C-36 Plumbing · 1112772
- Since
- 2023
- Expires
- Nov 30, 2027
- ZIP
- 95320
Balber Plumbing INC
Plumbing contractor
- License
- C-36 Plumbing · 1102352
- Since
- 2023
- Expires
- Mar 31, 2027
- ZIP
- 95320
Cowan Plumbing And Construction
Plumbing contractor
- License
- B General Building / C-36 Plumbing · 482256
- Since
- 1985
- Expires
- Oct 31, 2027
- ZIP
- 95320
Les' Plumbing
Plumbing contractor
- License
- C-36 Plumbing · 795019
- Since
- 2001
- Expires
- May 31, 2027
- ZIP
- 95320
LRV Plumbing Service
Plumbing contractor
- License
- C-36 Plumbing · 1106926
- Since
- 2023
- Expires
- Jul 31, 2027
- ZIP
- 95320
Mainline Plumbing INC
Plumbing contractor
- License
- C-36 Plumbing · 953726
- Since
- 2010
- Expires
- Oct 31, 2028
- ZIP
- 95320
Mid Valley Plumbing
Plumbing contractor
- License
- C-36 Plumbing · 957792
- Since
- 2011
- Expires
- May 31, 2028
- ZIP
- 95320
Next Level Plumbing Solutions
Plumbing contractor
- License
- C-36 Plumbing · 1156763
- Since
- 2026
- Expires
- Jun 30, 2028
- ZIP
- 95320
Questions for each trade
- Tile: who waterproofs the wall before new tile goes up, and what product do they use?
- Tile: does the quote include removing the old surround, or does that happen separately?
- Plumbing: is the new valve pressure-balance or thermostatic, and what brand and model?
- Plumbing: does the drain stay in its current spot, or is it moving?
- Glass: framed or frameless, and is the glass tempered to meet the safety-glazing rule for wet locations?
- Glass: what's the lead time on ordering, since custom glass is often the longest-lead item on the job?
- All trades: who is the single point of contact if something needs to be redone?